FEATURED PAPER By Lita Liana Jakarta, Indonesia ________________________________________________________________________ Abstract Under current project guideline, the regulator sets a 10% as single hurdle rate in determining oil and gas project economic for the Production Sharing Contract (PSC) contractor. A hurdle rate should represent project’s Minimum Attractive Rate of Return (MARR) which not only include money available for […]
↧